In 2014, we designed and bid a parking lot rehabilitation project at this property. The design divided the work into two phases: Phase 1 consisted of excavation and installation of a French drain, the addition of two (2) concrete dumpster pads, and concrete curb and gutter removal and replacement. Phase 2 consisted of asphalt milling and paving, and installation of new traffic markings and parking spaces. The building Owner engaged our office to provide quality assurance services during the project, which was completed in October, 2014.