In 2012, we designed and bid a parking lot rehabilitation project at this property. The work was performed in two phases. Phase 1 included excavation of the cooling tower drain lines, installation of new drainpipe, backfill of the soil over the new pipes, and milling and asphalt paving of the parking lot in its entirety. Phase 2, performed in 2013, was the application of a seal coat to the entire parking lot.