Our office was engaged by Property Management to design, bid, and provide quality assurance for a comprehensive garage and terrace rehabilitation project after in-depth surveys found numerous areas of deteriorated concrete, evidence of water infiltration in multiple locations along the foundation walls, expansion joints, and through the plaza/parking lot slab over the garage, areas of deteriorated/worn membrane on the upper level of the garage, and blocked or broken drains. The rehabilitation work commenced in October 2022 and was completed by the end of 2023.