Our office was engaged in Spring, 2020 to design and bid a roof anchor installation at this DC Waterfront property. With our oversight, the work started at the 3000 K Street building in the fall of 2020 and concluded in June of 2021 at the 3050 Building. The work included the installation of 228 anchors with flashing around each penetration at the 3000 building and 137 anchors with flashing at the 3050 Building. The anchors were load tested and certified in accordance with current code requirements as well.